Short Description:
The Moesa railway bridge near Bellinzona is a three-span bridge consisting of two parallel steel girders with their lower part supporting a 50 cm thick concrete deck. This new bridge was built parallel to the old steel bridge. After dismantling this later, the new bridge was then pushed on the old and refurbished pillars.
Aim of monitoring:
The aim of monitoring the Moesa Railway Bridge is to measure the concrete deformation due to shrinkage and the pushing of the bridge.
Main results:
The sensors that were usable after installation gave nice shrinkage curves similar to those encountered at Venoge. A discontinuity due to the heating produced by the concrete setting in the successive section was also visible. During the push phase, additional sensors were attached under the concrete slab and measured the curvature of the bridge due to uneven push
Related Papers:
INSTALLATION PERIOD | TYPE OF SENSORS | NUMBER OF SENSORS |
1996 | SOFO | 30 |