• Compagnies
  • Contactez-nous
  • English
  • Search icon
Logo Telemac
    • Produits
    • Applications
    • Services
    • Étude de cas
    • Resources
    • À propos
      • À propos
      • Nouvelles
      • Évenements
      • Contactez-nous
Close icon Close icon Logo Telemac
  • Search icon
    • Produits
    • Applications
    • Services
    • Étude de cas
    • Resources
    • À propos
      • À propos
      • Nouvelles
      • Évenements
      • Contactez-nous
  • Compagnies
  • Contactez-nous
  • English
  • Logo linkedin
  • Logo youtube
Home » Étude de cas » Lehrter Bahnhof Berlin -Étude de cas

Lehrter Bahnhof Berlin -Étude de cas

Publié le 3 mars 2017
  • Facebook Icon
  • Twitter Icon
  • LinkedIn Icon
  • Email Icon

The new Lehrter Bahnhof in the heart of Berlin - near the Reichstag - is being constructed as one of the largest stations in Europe with a very futuristic design

Image Lehrter Bahnhof Berlin -Étude de cas

The new Lehrter Bahnhof in the heart of Berlin – near the Reichstag – is being constructed as one of the largest stations in Europe with a very futuristic design. In its center is a large entrance hall at road level. A system of four partly pre-stressed concrete bridges for the east-west railway line on a level of about 10 m above road level crosses the hall. The north-south railway line runs underground at about -15 m. To bring sunlight to the underground level the central station area does not have continuous floors but is open. For this reason, the railway bridges in the hall area are supported by 23 m high slender steel columns, which are Y-shaped (fork-shaped) at their tops. The super-structure of the Lehrter Bahnhof, especially the wide-spanned glass roof consisting of almost 11,000 panes of glass spanned over the four pre-stressed railway bridges makes it particularly sensitive to settlement. Vertical displacements of adjacent piers should not differ by more than 10 mm.

Aim of monitoring:

Construction activities in the immediate vicinity, especially the dismantling of the old station building along the new track, cause settlements or heaves at the numerous piers which induce excessive deformations into the building. Because of these activities and the difficult nature of the soil in Berlin – mostly sand – the structure has to be monitored during construction, commissioning, and for the first few years after loading. Corrective decisions can then be made, i.e. raising or lowering the bridges at the supporting points, depending on measurement results. Common geodetic measurements of settlement and heave at the piers cannot be repeated at sufficiently short intervals due to time-consuming procedures and limited access to measurement points.

 

Main results:

By using continuous monitoring techniques it is possible to discover deviations from the expected structural performance or damage in time. On the other hand, corrections or optimisation of materials used are possible. Cooperation among the experts in the field of sensor technology and structural engineering has been the most productive. All co-workers made important contributions to the long-term use and safety of structures in the field of transportation. Especially, parallel long-term tests on large concrete beams are suited to give important information about the safety of large structures and the reliability of measurement data. This is the only way to get reliable and early information about the state of the building and to understand the relation to what happens in the environment of the site.

INSTALLATION PERIODTYPE OF SENSORSNUMBER OF SENSORS
2000 – 2002SOFO8

Related Papers:

Complex Measurement System for Long-Term Monitoring of Pre-stressed Railway Bridges of the New “Lehrter Bahnhof” in Berlin., W. Habel, H. Kohlhoff, J. Knapp, R. Helmerich, H. Hänichen, D. Inaudi, SPIE, International Symposium on Smart Structures and Materials, 17-21.3.2002, San Diego, USA – (Vol 4694, p 236-241) – 2002
Monitoring System for Long-term evaluation of prestressed railway bridges in the new Lehrter Bahnhof in Berlin, W. Habel, H. Kohlhoff, J. Knapp, R. Helmerich, Third World Conference on Structural Control, 7-12.4.2002, Como, Italy – 2002
Image

Lehrter Bahnhof area

Image

Monitored beam over two fork columns in the central part of the southern railway bridge

Image

SOFO sensor in a depression on the concrete surface before embedding.

Down arrow
fermer

Recherche

En cours...

Logo Roctest

Concepteur et manufacturier d’instrumentation géotechnique, structurale et d’équipements de test pour le sol et la roche

Logo Smartec

Concepteur et manufacturier d’instrumentation géotechnique, structurale et d’équipements de test pour le sol et la roche

Logo Telemac

Founisseur de solutions géotechniques et structurales depuis 1947

Logo Enomfra

Reconnaissance géologique, hydrogéologique
et géotechnique pour les projets les plus variés

Logo Roctest

Concepteur et manufacturier d’instrumentation géotechnique, structurale et d’équipements de test pour le sol et la roche

Logo Smartec

Concepteur et manufacturier d’instrumentation géotechnique, structurale et d’équipements de test pour le sol et la roche

Logo Telemac

Founisseur de solutions géotechniques et structurales depuis 1947

Logo Enomfra

Reconnaissance géologique, hydrogéologique
et géotechnique pour les projets les plus variés

Légal
  • Déclaration de confidentialité
  • Conditions générales de ventes
  • Plan du site
Suivez-nous
  • Logo linkedin
  • Logo youtube
Logo Logo