The construction of the Koudiat Acerdoune dam, with a capacity of 450 million m3, was allotted by the National Dam Agency to Razel Algeria. Made out of compacted concrete, the dam is supported by marly-shale soils.
Aim of monitoring:
The Koudiat Acerdoune Dam Project monitored the temperature gradient inside the dam and used a passive detection system to get the absolute temperature.
Main results:
A total of 4 independent lines were installed, from 400 m up to 2000 m. The sensing cables were directly embedded into the concrete.
INSTALLATION PERIOD | TYPE OF SENSORS |
2006 – 2009 | DiTeSt / DiTemp |