• Companies
  • Contact
  • Français
  • Search icon
Logo Telemac
    • Products
    • Applications
    • Services
    • Case studies
    • Resources
    • About
      • About
      • News
      • Events
      • Contact
Close icon Close icon Logo Telemac
  • Search icon
    • Products
    • Applications
    • Services
    • Case studies
    • Resources
    • About
      • About
      • News
      • Events
      • Contact
  • Companies
  • Contact
  • Français
  • Logo linkedin
  • Logo youtube
Home » Case studies » Soumagne Tunnel

Soumagne Tunnel

Published on February 2 2017
  • Facebook Icon
  • Twitter Icon
  • LinkedIn Icon
  • Email Icon

The major project of the Belgian rail way at the beginning of 21 century is the construction of a new high-speed railroad from Brussels via Liege and Aachen to Cologne.

Image Soumagne Tunnel

The major project of the Belgian rail way at the beginning of 21 century is the construction of a new high-speed railroad from Brussels via Liege and Aachen to Cologne. To be able to maintain a velocity of 300 km/h the path of the existing rather curved railroad will not be followed. Unavoidably a tunnel needs to be constructed to pass through some hills on the way from Liege to the plateau de Herve. This tunnel is the Soumagne tunnel. The plateau de Herve contain a very complex Visean-Namurian interface geology with carbon and karst. Drilling the tunnel is complex in this zone and necessitate monitoring of the vault displacement.

Aim  of monitoring:
The main aim of the project has been to monitor two tunnel cross-sections with radial and tangential sensor. The tangential senosors with active zone of 1 m provided for average strain monitoring in the tunnel cross-section. The radial sensors were combined in three-points extensometers that measured relative displacement of vaults (convergence) at three different positions of the cross-section, and distirbution of average strain in the soil. The lengths of SOFO sensors used to form a multi-point extensometer are 1 m, 5m and 10 m. Three thermocouples are also placed in each cross-section in order to determine and separate the strain genrated by temperature variations.

INSTALLATION PERIODTYPE OF SENSORSNUMBER OF SENSORS
2003SOFO20
Image

Soumagne tunnel during construction

Image

Schema of sensors position

Image

Installation of sensors

Down arrow
close

Search Telemac

Searching...

Logo Roctest

Developer and Manufacturer of Geotechnical & Structural Instruments and Soil/Rock Testing Equipment

Logo Smartec

Provider of innovative Fiber Optic Solutions for Structural Health Monitoring and Geotechnical Instrumentation

Logo Telemac

Provider of Geotechnical & Structural Instruments
since 1947

Logo Enomfra

Provider of Hydrogeological & Geotechnical Services. Investigations, Monitoring & Testing

Logo Roctest

Developer and Manufacturer of Geotechnical & Structural Instruments and Soil/Rock Testing Equipment

Logo Smartec

Provider of innovative Fiber Optic Solutions for Structural Health Monitoring and Geotechnical Instrumentation

Logo Telemac

Provider of Geotechnical & Structural Instruments
since 1947

Logo Enomfra

Provider of Hydrogeological & Geotechnical Services. Investigations, Monitoring & Testing

Legal
  • Privacy Notice
  • Terms and Conditions of Sales
  • Sitemap
Follow us
  • Logo linkedin
  • Logo youtube
Logo Logo