• Companies
  • Contact
  • Français
  • Search icon
Logo Telemac
    • Products
    • Applications
    • Services
    • Case studies
    • Resources
    • About
      • About
      • News
      • Events
      • Contact
Close icon Close icon Logo Telemac
  • Search icon
    • Products
    • Applications
    • Services
    • Case studies
    • Resources
    • About
      • About
      • News
      • Events
      • Contact
  • Companies
  • Contact
  • Français
  • Logo linkedin
  • Logo youtube
Home » Case studies » Pont Adolphe Luxembourg

Pont Adolphe Luxembourg

Published on January 30 2017
  • Facebook Icon
  • Twitter Icon
  • LinkedIn Icon
  • Email Icon

In order to prevent significant damaging of the bridge, perpendicular post-tensioning cables were installed

Image Pont Adolphe Luxembourg

The bridge Pont Adolphe in Luxembourg is a major construction designed by the French engineer P. Sejourne and built from 1899 throughout 1903. The bridge is made of two masonry arches with a span of 84.6 m on the central. At the time of the construction the bridge held the world’s largest arch span for a masonry struction. To day the bridge is still one of the world’s most prominet masonry construction. In 1961 the bridge underwent some important refurbishement works with the aim of enlarging transversally the upper deck.

Aim of monitoring:

Over the time cracks opened along the neutral axis of the main arches. In order to prevent significant damaging of the bridge, perpendicular post-tensioning cables were installed. Thereafter the bridge was equipped with SOFO sensors in order to monitor effectiveness of the strengthening (main reason for crack occurring) and to understand the real behavior of the bridge over the long term. Dynamic tests were also performed on this bridge, and SOFO sensors were monitored with the SOFO Dynamic Reading Unit. 

INSTALLATION PERIODTYPE OF SENSORSNUMBER OF SENSORS
2006SOFO42
Image

Pont Adolphe lateral view

Image

Pont Adolphe internal arch

Main results:

The resulting measurments showed that no bending and no shear strain anomalies were noticed. Also no relative rotations and no shear sliding between the blocks were detected. Only small average elongation changes were noticed, which seemed to be correlated to temperature variations due to day-night temperature fluctations. During the analyzed period the structural behavior of the monitored area of the bridge is estimated to be correct and without anomalies. Dynamic tests results are not available.

Down arrow
close

Search Telemac

Searching...

Logo Roctest

Developer and Manufacturer of Geotechnical & Structural Instruments and Soil/Rock Testing Equipment

Logo Smartec

Provider of innovative Fiber Optic Solutions for Structural Health Monitoring and Geotechnical Instrumentation

Logo Telemac

Provider of Geotechnical & Structural Instruments
since 1947

Logo Enomfra

Provider of Hydrogeological & Geotechnical Services. Investigations, Monitoring & Testing

Logo Roctest

Developer and Manufacturer of Geotechnical & Structural Instruments and Soil/Rock Testing Equipment

Logo Smartec

Provider of innovative Fiber Optic Solutions for Structural Health Monitoring and Geotechnical Instrumentation

Logo Telemac

Provider of Geotechnical & Structural Instruments
since 1947

Logo Enomfra

Provider of Hydrogeological & Geotechnical Services. Investigations, Monitoring & Testing

Legal
  • Privacy Notice
  • Terms and Conditions of Sales
  • Sitemap
Follow us
  • Logo linkedin
  • Logo youtube
Logo Logo