• Companies
  • Contact
  • Français
  • Search icon
Logo Telemac
    • Products
    • Applications
    • Services
    • Case studies
    • Resources
    • About
      • About
      • News
      • Events
      • Contact
Close icon Close icon Logo Telemac
  • Search icon
    • Products
    • Applications
    • Services
    • Case studies
    • Resources
    • About
      • About
      • News
      • Events
      • Contact
  • Companies
  • Contact
  • Français
  • Logo linkedin
  • Logo youtube
Home » Case studies » Auxiliary tunnel at BBT project

Auxiliary tunnel at BBT project

Published on January 23 2017
  • Facebook Icon
  • Twitter Icon
  • LinkedIn Icon
  • Email Icon

Monitor the convergence and generally the structural behavior in one specific section of the tunnel where there are border conditions changes.

Image Auxiliary tunnel at BBT project

Monitor convergence in a key section of an auxiliary tunnel of BBT (Brenner Base Tunnel) project

INSTALLATION PERIODTYPE OF SENSORSNUMBER OF SENSORS
2014MuST8
Down arrow
close

Search Telemac

Searching...

Logo Roctest

Developer and Manufacturer of Geotechnical & Structural Instruments and Soil/Rock Testing Equipment

Logo Smartec

Provider of innovative Fiber Optic Solutions for Structural Health Monitoring and Geotechnical Instrumentation

Logo Telemac

Provider of Geotechnical & Structural Instruments
since 1947

Logo Enomfra

Provider of Hydrogeological & Geotechnical Services. Investigations, Monitoring & Testing

Logo Roctest

Developer and Manufacturer of Geotechnical & Structural Instruments and Soil/Rock Testing Equipment

Logo Smartec

Provider of innovative Fiber Optic Solutions for Structural Health Monitoring and Geotechnical Instrumentation

Logo Telemac

Provider of Geotechnical & Structural Instruments
since 1947

Logo Enomfra

Provider of Hydrogeological & Geotechnical Services. Investigations, Monitoring & Testing

Legal
  • Privacy Notice
  • Terms and Conditions of Sales
  • Sitemap
Follow us
  • Logo linkedin
  • Logo youtube
Logo Logo